Presentation of first PTP results and findings at WindEurope 2018 (26.09. -28.09.18 in Hamburg, Germany)

Presentation of first PTP results and findings at WindEurope 2018 (26.09. -28.09.18 in Hamburg, Germany)

The measurement phase of the iSpin Performance Transparency Project (PTP) – one of the largest and most systematic demonstration projects for a wind measurement system – has successfully started. 59 of in total planned 90 iSpin systems have been installed,  covering two different turbine types – each of them located in three wind farms of different terrain complexity. The first findings for one year of iSpin data along with site specific reference system data (met mast or nacelle LiDAR) and the comparison with conventional nacelle anemometer  data are presented.

0 Comments

Leave a reply

Your email address will not be published. Required fields are marked *

*